D3-TUI Build/Validation Survey - Proto-Run Results

Team: d3-tui-triad
Agent: builder-reviewer
Date: 2026-05-11
Phase: T0 Intake → T1 Review/Research (Read-Only Proto-Run)


📋 Overview

This directory contains the results of the read-only proto-run survey of the D3-TUI build system, validation infrastructure, and asset extraction pipeline.


📚 Documents

1. Executive Summaryexecutive-summary.md

High-level overview, risk assessment, and recommendations
Audience: Team lead, decision makers
Length: 6,891 bytes
Key Sections: Mission context, build status, critical blockers, next steps

2. Build Surveybuild-survey.md

Comprehensive technical analysis of build system and infrastructure
Audience: Developers, builders, reviewers
Length: 7,111 bytes
Key Sections: Build system analysis, test infrastructure, validation, asset pipeline, documentation, recommendations

3. Quick Statusquick-status.md

Concise summary of current state and next actions
Audience: Quick reference, standup updates
Length: 1,639 bytes
Key Sections: Working components, blockers, next actions, key files, commands

4. Completion Checklistcompletion-checklist.md

Verification of all survey tasks and mission compliance
Audience: Quality assurance, audit trail
Length: 4,304 bytes
Key Sections: Task checklist, artifacts produced, statistics, mission compliance


🎯 Key Findings

✅ Working Components

🚧 Critical Blocker

Asset Extraction Pipeline: - Private D2 assets not in repo (staged externally) - Title-menu PVM/PVR files not extracted from disc image - Manifest contains placeholder entry names - Cannot build D2 title menu target without extraction

📋 Required Files

NLOGO.PVM, Q_TITLEBGMT[0-2].PVM, Q_TITLEMENU.PVM, Q_DMTITLE.PVM
Q_DJSNOW.PVM, SAKA_MNSNOW1[ABC].PVM, P_COMTIT*.PVR, etc.

🔧 Next Steps

  1. Extract PVM/PVR files from private D2 staging
  2. Run discovery: python3 tools/extract_d2_menu_assets.py --discover
  3. Update manifest with confirmed entry names
  4. Run make d2-assets
  5. Update src/d3tui_main.c rendering

📊 Quick Stats


🔗 Related Documents

Authoritative (Current)

Reference (Pre-realignment)


📬 Communication

Messages Sent to Team Lead

  1. Initial Findings: Build survey complete - asset extraction blocked
  2. Executive Summary: Survey complete - asset extraction is critical path

Status


🛠️ Usage

For Team Lead

  1. Read executive-summary.md for high-level overview
  2. Review build-survey.md for technical details
  3. Check completion-checklist.md for task verification
  4. Dispatch asset extraction task to appropriate agent

For Developers

  1. Read quick-status.md for current state
  2. Review build-survey.md for build system details
  3. Check executive-summary.md for recommendations

For Reviewers

  1. Read completion-checklist.md for compliance verification
  2. Review executive-summary.md for risk assessment
  3. Check build-survey.md for technical accuracy

🎓 Summary

The D3-TUI project has a functional build system and clear target definition, but is blocked on asset extraction. The asset extraction pipeline requires:

  1. Private D2 material from external staging
  2. Extraction of title-menu PVM/PVR files
  3. Discovery of exact PVM entry names
  4. Manifest update and C asset generation

All other components (build system, tests, validation, documentation) are ready and functional.

Status: Survey complete. Ready for implementation phase dispatch.


Proto-run results - 2026-05-11