D3-TUI Build/Validation Survey - Proto-Run Results
Team: d3-tui-triad
Agent: builder-reviewer
Date: 2026-05-11
Phase: T0 Intake → T1 Review/Research (Read-Only Proto-Run)
📋 Overview
This directory contains the results of the read-only proto-run survey of the D3-TUI build system, validation infrastructure, and asset extraction pipeline.
📚 Documents
1. Executive Summary → executive-summary.md
High-level overview, risk assessment, and recommendations
Audience: Team lead, decision makers
Length: 6,891 bytes
Key Sections: Mission context, build status, critical blockers, next steps
2. Build Survey → build-survey.md
Comprehensive technical analysis of build system and infrastructure
Audience: Developers, builders, reviewers
Length: 7,111 bytes
Key Sections: Build system analysis, test infrastructure, validation, asset pipeline, documentation, recommendations
3. Quick Status → quick-status.md
Concise summary of current state and next actions
Audience: Quick reference, standup updates
Length: 1,639 bytes
Key Sections: Working components, blockers, next actions, key files, commands
4. Completion Checklist → completion-checklist.md
Verification of all survey tasks and mission compliance
Audience: Quality assurance, audit trail
Length: 4,304 bytes
Key Sections: Task checklist, artifacts produced, statistics, mission compliance
🎯 Key Findings
✅ Working Components
- Build system:
make elf,make flycast-image,make clean - Build script: KOS detection, ELF compilation, validation, manifest generation
- Test infrastructure: 30+ tests (manual compilation)
- Validation: Script-based ELF/Flycast validation
- Documentation: Authoritative docs aligned to realignment
🚧 Critical Blocker
Asset Extraction Pipeline: - Private D2 assets not in repo (staged externally) - Title-menu PVM/PVR files not extracted from disc image - Manifest contains placeholder entry names - Cannot build D2 title menu target without extraction
📋 Required Files
NLOGO.PVM, Q_TITLEBGMT[0-2].PVM, Q_TITLEMENU.PVM, Q_DMTITLE.PVM
Q_DJSNOW.PVM, SAKA_MNSNOW1[ABC].PVM, P_COMTIT*.PVR, etc.
🔧 Next Steps
- Extract PVM/PVR files from private D2 staging
- Run discovery:
python3 tools/extract_d2_menu_assets.py --discover - Update manifest with confirmed entry names
- Run
make d2-assets - Update
src/d3tui_main.crendering
📊 Quick Stats
- Files Analyzed: 15+
- Lines Reviewed: 1,000+
- Artifacts Created: 4
- Total Bytes Written: 19,945
- Messages Sent: 2
- Blockers Identified: 1 (critical)
- Recommendations: 8
🔗 Related Documents
Authoritative (Current)
/work/repo/docs/REALIGNMENT_BRIEF.md/work/repo/docs/D2_TITLE_MENU_TARGET.md/work/repo/docs/ASSET_EXTRACTION_MAP.md/work/repo/docs/BUILD_TARGET_POLICY.md
Reference (Pre-realignment)
/work/repo/BUILD_VERIFICATION.md/work/repo/BUILD_STATUS.md- Archive:
/mnt/kitchen/from-house/archive/d3-tui/pre-realign-20260510T194241Z
📬 Communication
Messages Sent to Team Lead
- Initial Findings: Build survey complete - asset extraction blocked
- Executive Summary: Survey complete - asset extraction is critical path
Status
- Phase: T0/T1 Read-Only Proto-Run ✅ COMPLETE
- Next Phase: Awaiting team lead dispatch for implementation
- Mission Compliance: All constraints respected ✅
🛠️ Usage
For Team Lead
- Read executive-summary.md for high-level overview
- Review build-survey.md for technical details
- Check completion-checklist.md for task verification
- Dispatch asset extraction task to appropriate agent
For Developers
- Read quick-status.md for current state
- Review build-survey.md for build system details
- Check executive-summary.md for recommendations
For Reviewers
- Read completion-checklist.md for compliance verification
- Review executive-summary.md for risk assessment
- Check build-survey.md for technical accuracy
🎓 Summary
The D3-TUI project has a functional build system and clear target definition, but is blocked on asset extraction. The asset extraction pipeline requires:
- Private D2 material from external staging
- Extraction of title-menu PVM/PVR files
- Discovery of exact PVM entry names
- Manifest update and C asset generation
All other components (build system, tests, validation, documentation) are ready and functional.
Status: Survey complete. Ready for implementation phase dispatch.
Proto-run results - 2026-05-11