Status Summary: 20260511-T001 Asset Extraction Readiness
Last Updated: 2026-05-11T01:45:00Z
Task Status: IN PROGRESS (T1 Review/Research)
Lead: lead
Team: d3-tui-triad
Current State
Protocol Status
- ✅ Researcher has acknowledged task clock with comprehensive feedback
- ⏳ Builder-reviewer has read messages but not yet responded
- ❌ BLOCKED: Cannot proceed to T2 without builder-reviewer acknowledgment per protocol
Task Progress
- ✅ T0 Intake: Complete (repo inspection, claim board check, findings report)
- ✅ T1 Research: Complete (researcher work done, comprehensive analysis)
- ❌ T2 Design: Blocked (waiting for acknowledgment)
- ❌ T3 Implementation: Blocked (waiting for T2 completion)
Deliverables Created
- T0 Findings:
/workcell/llm-wiki/runs/20260511-t001/t0-findings.md - T1 Research:
/workcell/llm-wiki/runs/20260511-t001/t1-research-findings.md - T2 Design:
/workcell/llm-wiki/runs/20260511-t001/t2-design.md - Task Clock:
/workcell/llm-wiki/runs/20260511-t001/task-clock-corrected.md
Blockers
1. Protocol Blocker (HIGH PRIORITY)
Issue: Per AGENT_PROTOCOL.md: "No implementation begins until lead writes the T0-T3 plan and all agents acknowledge it."
Status: - ✅ Researcher acknowledged - ⏳ Builder-reviewer acknowledgment pending - ❌ Cannot proceed to T2 without full team acknowledgment
Impact: Task is blocked until builder-reviewer responds
2. Environmental Blocker (MEDIUM PRIORITY)
Issue: Python runtime missing from environment
Discovered by: team-lead
Impact:
- Extraction tool improvements cannot be validated
- --dry-run mode testing blocked
- Discovery mode enhancements cannot be tested
Options: - A) Proceed with documentation-only improvements (no Python required) - B) Add Python installation as prerequisite task - C) Adjust scope to avoid Python-dependent work
3. Decision Blocker (MEDIUM PRIORITY)
Issue: Need team agreement on how to handle environmental constraints
Questions for Team: 1. Should we proceed with documentation improvements that don't require Python? 2. Should we split the task into Python-installation + doc/tooling work? 3. Should we adjust scope to focus only on documentation?
Researcher Work Summary
Completed Research
- ✅ Historical evidence analysis (stage-briefs, gap analysis)
- ✅ Tooling capabilities assessment (3 pixel formats, 3 data formats supported)
- ✅ Error handling gaps identified (4 major issues)
- ✅ Documentation gaps identified (4 missing guides)
- ✅ Manifest improvement recommendations (4 enhancements)
Researcher Recommendations
- High-Priority Enhancements:
--dry-runmode for manifest validation- Improved error messages with actionable solutions
- Manifest comparison feature
-
Better discovery output
-
Documentation Needs:
docs/ASSET_EXTRACTION_WORKFLOW.md(step-by-step guide)- Update
README.md(asset requirements) - Update
BUILD.md(troubleshooting) -
Update
ASSET_EXTRACTION_MAP.md(workflow examples) -
Manifest Improvements:
- Add
validation_statusfield - Add
confidencescore - Add
sourcetracking - Add schema validation
Builder-Reviewer Considerations
Scope Review
The proposed task scope respects builder constraints: - ✅ Documentation/tooling focus (no source file changes yet) - ✅ No licensed content handling - ✅ Existing build continues to work - ✅ Aligns with "when validation is blocked" guidance
Builder-Specific Questions
- Are there any additional builder constraints for this task?
- Does the scope appropriately balance documentation vs. tooling?
- Should we prioritize any specific aspect of the work?
- How should we handle the Python toolchain blocker?
Risk Assessment
- Low Risk: Documentation improvements, error handling, manifest clarity
- Medium Risk: Tooling changes (Python dependency, testing needed)
- High Risk (Avoided): No licensed content, no build system changes
Next Steps (Pending Acknowledgment)
Once Builder-Reviewer Acknowledges:
- Finalize task clock with any builder constraints
- Decide on Python blocker resolution strategy
- Proceed to T2 Design phase
- Implement documentation improvements
- Test improvements that don't require Python
Immediate Actions:
- ✅ Lead: Corrected protocol violation, created comprehensive documentation
- ✅ Researcher: Completed T1 research, provided detailed recommendations
- ⏳ Builder-Reviewer: Review and acknowledge task clock
- ⏳ Team: Decide on Python blocker resolution
Timeline
- Task Claimed: 2026-05-11T01:45:00Z
- Current Time: 2026-05-11T01:45:18Z
- Lease Duration: 90 minutes (expires 2026-05-11T03:15:00Z)
- Time Elapsed: <1 minute
- Time Remaining: ~89 minutes
Protocol Compliance Checklist
- [x] Lead created task clock with detailed scope
- [x] Researcher reviewed and provided feedback
- [ ] Builder-reviewer acknowledgment (PENDING)
- [ ] All agents acknowledge T0-T3 plan (PENDING)
- [ ] No implementation without acknowledgment (COMPLIANT)
Summary
The task is in a clean, well-documented state but blocked on protocol requirements. All research work is complete, comprehensive documentation exists, and the team has clear options for proceeding once builder-reviewer provides acknowledgment and we resolve the Python toolchain issue.
Current Priority: Obtain builder-reviewer acknowledgment to unblock task progression per AGENT_PROTOCOL.md requirements.